Guilford mill cleanup (TCE)
Tracker updated Nov 24, 2026, 12:01 PM EST · page built Nov 25, 2026, 3:47 PM EST
AI-written The former textile mill on the Piscataquis River in Guilford is a Maine DEP cleanup site (REM02472). The solvent TCE is in the soil, groundwater, river and air under nearby homes. This page follows the cleanup, the planned dam removal and building demolition, and the drinking water question. Why it matters: The river runs past the Guilford-Sangerville water district's wells and on to Dover-Foxcroft. Public money is paying for part of the work at the site.
- This page records the public record. It is not legal advice and makes no finding of wrongdoing.
- Sources are Maine DEP's site file (REM02472) and EPA databases, read 2026-11-19. Homeowners' results and addresses are left out on purpose.
- Shipping records show what hazardous waste left the mill, not when or how TCE reached the ground.
At a glance
| Item | State | Basis |
|---|---|---|
| Site | Former Piscataquis Woolen Company mill, both banks of the Piscataquis River, Guilford. Owner: Duvaltex (US), Inc. DEP Voluntary Response Action Program site REM02472. | Verified maine.gov |
| Contamination | TCE in soil, groundwater, soil gas and river water; TCE "discharging to the River from the Site" (DEP, July 2025). Also petroleum, and lead in one soil sample above all guidelines. | Verified maine.gov |
| Planned work | The Nature Conservancy intends to fund removal of the Guilford dam and demolition of 12 mill buildings. It will not own the site; DEP has said it will not treat TNC as a responsible party if the work follows an approved plan (letter of 2026-09-08). | Verified maine.gov |
| Drinking water | The Guilford-Sangerville Utilities District serves 1,535 people from wells that DEP's hydrogeologist says appear to sit in the same aquifer about 2,500 feet downstream. Tests in 2020, 2023 and January 2025 found no solvents. No later result is in DEP's file. | Verified maine.gov |
| Not yet in the public record | The cost of the dam removal and demolition and how much public money pays for it; who will pay for the TCE cleanup, and when; who will own and use the land afterward; who is buying the mill warehouse. | Verified maine.gov |
Deadlines
| Date | What | Basis |
|---|---|---|
| Jul 31, 2027 in 248 days | End of the NOAA award period for TNC's Piscataquis work (no extension on record as of 2026-11-19) | Verified usaspending.gov |
Parties and the public record
| Who | Role | On the record | Basis |
|---|---|---|---|
| Duvaltex (US), Inc. | Site owner since 2016 | DEP wrote in July 2025 that the Duvaltex entities 'may be considered potentially responsible parties' and that the 2016 liability release is 'at best, extremely limited'. Remains owner under the 2026 TNC plan. Possible gain: DEP's letter describes others paying to remove the dam and 12 buildings on land Duvaltex keeps. This is this page's reading; DEP states no benefit to Duvaltex. | Verified maine.gov |
| The Nature Conservancy | Funds the planned dam removal and demolition | Will not own the site, buildings or dam. DEP's 2026-09-08 letter says DEP will not treat TNC as a responsible party if the work follows an approved plan. Possible gain: not stated here; protection from being treated as a responsible party is DEP's recorded condition. | Verified maine.gov |
| Piscataquis County Economic Development Council | EPA brownfields grantee | Assessing the mill warehouse 'to support a potential purchase'; the buyer is not named in the record. | Verified maine.gov |
| Guilford-Sangerville Utilities District | Public water supplier (1,535 people) | Wells about 2,500 feet downstream in what DEP's hydrogeologist says appears to be the same aquifer. Solvent tests 2020, 2023 and January 2025: none found. No later result in DEP's file. | Verified maine.gov |
Timeline
| Date | Event | Basis |
|---|---|---|
| Dec 17, 1986 | EPA hazardous-waste records list Interface Inc (Atlanta) as owner of the Guilford mill from 1986; operator Interface Fabrics Group. TCE-coded waste (U228) was shipped from the mill on 1994-11-22; spent halogenated solvents (F002) in 1993 and 1994. | Verified maine.gov |
| Jul 1, 2007 | True Textiles, Inc becomes owner of record (operator True Guilford, Inc). TCE-toxicity waste (D040) shipped 2007-08-01. | Verified maine.gov |
| Nov 24, 2015 | Before the sale, TCE over 1,000 ug/m3 was measured under three buildings (2015). DEP: the purchaser is eligible for VRAP liability protection; 'the seller is not eligible'. | Verified maine.gov |
| Nov 29, 2016 | DEP issues a No Further Action Assurance to Duval Acquisition (US) Inc. after a VRAP cleanup; 2016 reports projected river TCE at 3.9 ug/l without sampling the river. | Verified maine.gov |
| Jan 1, 2024 | Duvaltex runs textile operations from about 2016 until operations were suspended in 2024 (DEP memo 2025-04-17). | Verified maine.gov |
| Jul 11, 2024 | VHB Phase I for Inter-Fluve and The Nature Conservancy: due diligence 'in support of a potential real estate transaction'. Phase II (Jan 2025, 'on behalf of' TNC): TCE in river pore water 54,000 ug/l, surface water 41 ug/l; groundwater 2,600; lead in soil 4,240 mg/kg; PFAS detected. | Verified maine.gov |
| Apr 17, 2025 | DEP hydrogeologist: 'a continuing TCE plume', likely NAPL source; site on a sand and gravel aquifer that appears to hold the two Guilford-Sangerville water district wells about 2,500 ft downstream; recommends sampling the public supply, nearby homes, and fish tissue. | Verified maine.gov |
| Apr 24, 2025 | State drinking water program: district VOC tests 2020, 2023 and Jan 2025 all non-detect; considering whether to require VOC testing. No later result in DEP's file. EPA SDWIS: no VOC violations for the district (violations only, not results). | Verified maine.gov |
| Jul 15, 2025 | DEP to Duvaltex: TCE 'discharging to the River from the Site'; 2016 liability release 'at best, extremely limited'; Duvaltex entities 'may be considered potentially responsible parties'; no residential use recommended. | Verified maine.gov |
| Aug 27, 2025 | DEP: RCRA generator closure obligation, no closure certification. PCEDC has a brownfields application for the mill's office portion. | Verified maine.gov |
| Jun 8, 2026 | DEP site walk with PCEDC's brownfields contractor for a 'potential purchase' of the mill's warehouse (buyer not named). The warehouse's sub-slab venting system was off, though running it is a VRAP condition. | Verified maine.gov |
| Sep 8, 2026 | DEP Commissioner to TNC: TNC intends to fund the dam removal and demolition of 12 buildings; will not own the site, buildings or dam; Duvaltex remains owner; DEP will not name TNC a responsible party under an approved plan. Cost, funds and TCE cleanup not stated. | Verified maine.gov |
| Oct 7, 2026 | PCEDC signs EPA Brownfields 'All Appropriate Inquiries' checklist for the mill warehouse (grant BF-00A01951-0, ACRES 272051). | Verified maine.gov |
| Oct 29, 2026 | GZA slope-stability proposal for VHB's Guilford design (75/90 percent milestones): dam-removal design is well advanced. | Verified maine.gov |
| Nov 19, 2026 | USAspending: TNC's $19.9M Piscataquis award has spent $1.32M; ends 2027-07-31; no extension on record. | Verified usaspending.gov |
Update log
| Found | Event date | What | Basis |
|---|---|---|---|
| Nov 19, 2026 | Sep 8, 2026 | Page started from Maine DEP's site file and EPA records. | Verified maine.gov |